16 Best Divi Products You’ve Never Heard Of (On Sale!)

Last Updated on August 22, 2024 by Leave a Comment

16 Best Divi Products You’ve Never Heard Of (On Sale!)
Blog / Divi Resources / 16 Best Divi Products You’ve Never Heard Of (On Sale!)

If you haven’t heard, the Divi Summer Sale is live! There are plenty of savings on Divi, Divi AI, Divi Cloud, Divi Teams, Divi VIP, and Divi Marketplace Bundles! In addition to those, the Divi Marketplace is offering huge deals that are too good to pass up.

Take Me to the Sale

ET Divi Marketplace

Every surface of the Divi Ecosystem has a sale going on right now. I’ll just take 10 seconds here before moving to the best Sleep Deals—look at these steep discounts ?

Peel the Curtain Back on the Summer Sale

Divi Products that You’ve Never Heard Of (But Are On Sale)

You know about all the amazing features built into the Divi Theme, and you probably are also aware of a few popular marketplace items—things like Divi Pixel, Divi Table Maker, and Divi Events Calendar. But we wanted to surface some of the best hidden gems for you.

With discounts of up to 50% off (for everyone) and $50 in Marketplace credit for Divi Pro buyers, now is the time to expand your Divi toolkit with some of the best-kept secrets in the Divi ecosystem. Remember, all marketplace items can be used on unlimited websites for the license duration, making this one of the best WordPress deals ever.

Ready to see the deep cuts that made our list? Continue on.

1. Divi Schema Plugin

Was $99, now $79.20, during the Divi Summer Sale

Divi Schema Plugin

The Divi Schema Plugin by WP Tools is a must-have for anyone serious about SEO. This plugin adds structured data to your website, helping search engines better understand your content and improving your site’s visibility in search results. It’s particularly valuable for those with multiple websites since you can use it on an unlimited number of them—saving you from getting this feature on a costly per-site license through other schema/SEO plugins.

  • Automatically add schema markup to pages and posts
  • Supports various schema types, including FAQs, Reviews, Google Maps, and Local Business
  • Several Divi Modules for adding content to your page, plus every type of schema is added to pages via JSON+LD

At just $79.20 (normally $99), it’s a truly powerful and useful tool worth your attention with a perfect 5-star rating.

Get Divi Schema Plugin

2. Titan Child Theme for WooCommerce

Was $25, now $12.50, during the Divi Summer Sale

Titan Child Theme

Looking to elevate a new WooCommerce store while also saving time building it? The Titan Child Theme by Mark Hendriksen is a sleek, modern theme designed to enhance the user experience on your eCommerce site. It comes with some gorgeous page layouts, mega menus, and online store money-makers.

  • Easy WooCommerce design with 30+ page layouts and adjustable colors/styles
  • Optimized for conversions with Product Quick Views, Fly Cart, and advanced Product Filters
  • Completely customizable with Divi’s visual builder

Originally priced at $25 and now at $12.50, this child theme is a steal. Pair that with a flawless 5-star rating from 249 sales and you got yourself a looker.

Get Titan Child Theme

3. Divi My Account Page

Was $59, now $47.20, during the Divi Summer Sale

Divi My Account Page Marketplace Extension

The Divi My Account Page transforms standard WooCommerce account pages into beautifully designed ones that extend your brand and functionality. This Divi Extension really makes a difference on those traditionally boring account pages.

  • Customizes WooCommerce account pages for a branded experience throughout your shop
  • Easily show past purchases, downloads, payment methods, and other WooCommerce endpoints
  • Easy integration with Divi Builder for full customization to style account page tables, forms, and notifications

Sporting a shiny 5-star rating from its few but delighted users, this plugin is available at a discounted price of $47.20 (normally $59). Dare I say, grab this deal now.

Get Divi My Account Page

4. DiviSwift Booking Pro

Was $49, now $39.20, during the Divi Summer Sale

Divi Booking Pro Extension

For businesses that rely on bookings, the DiviSwift Booking Pro plugin offers a comprehensive solution for managing appointments and reservations directly within Divi. It’s great for getting people in your door and managing everything from your WordPress install without needing an external service.

  • Easily set up your schedule by adding timeslots and booking types
  • Fully customizable (and great-looking) forms, calendars, and reminder emails
  • Approval system for appointments and other booking management tools

At $39.20 (down from the original $49), this investment is sure to pay off (not to mention its perfect 5-star rating).

Get DiviSwift Booking Pro

5. Divi Blog Ultra

Was $29, now $23.20, during the Divi Summer Sale

Divi Blog Ultra Extension

Boost your blog’s design with Divi Blog Ultra by Divi Extensive. This plugin offers a range of layout options and customization features to make your blog stand out.

  • Four blog post layouts, three post list layouts, and blog page demos for predesigned options
  • Works for posts, taxonomies, search results, custom post types, and related posts (did anyone say Swiss Army Knife?)
  • Paginate your lists the way you want with Next/Prev or Numbered pagination

Although it’s new to the marketplace with only one sale, it’s priced at $23.20 (normally $29) and is worth snatching during the sale.

Get Divi Blog Ultra

6. Divi Assistant

Was $69, now $55.20, during the Divi Summer Sale

Divi Assistant Pee-Aye Extension

Enhance your workflow with Divi Assistant by Pee-Aye Creative, a plugin designed to speed up your Divi design process with custom shortcuts and tools. It offers an easy way to enable dozens of features/hacks that WordPress users usually have to find a manual way to accomplish.

  • Manage global settings and styles with ease
  • Includes tools for advanced Divi customizations
  • Enhances workflow with shortcuts and admin tools

While Pee-Aye Creative is hardly an unknown extension author, with 51 sales, Divi Assistant is under-purchased and something you should jump on. With a 5-star rating and priced at $55.20 (typically $69), it is a must-have for any serious Divi user.

Get Divi Assistant

But hold on a second. Divi Assistant is included in the Summer Sale Feature Booster Bundle. Get this extension and a ton of others for 50% off.

Get the Whole Feature Booster Bundle

7. DiviJet Booking & Reservation

Was $29, now $23.20, during the Divi Summer Sale

Divi Booking & Reservation DiviJet Extension

Another great option for businesses that require booking functionality is DiviJet Booking & Reservation. This plugin offers flexible booking forms and integration with Divi, making it easy to manage reservations.

  • Flexible booking and reservation system for multiple industries
  • Customizable time slots and availability settings so you can have appointments happen on your schedule
  • Easy integration with Divi for perfectly designed reservation flows

It is now available for $23.20 (normally $29) and is a heck of a sleeper with only 40 sales but a solid 5-star rating.

Get DiviJet Booking & Reservation

8. Team Member Popup Modal Layout Pack

Was $7.99, now $6.39, during the Divi Summer Sale

Team Member Popup Modal Layout for Divi

The Team Member Popup Modal Layout Pack by Layout Divi adds interactive team member profiles to your site, perfect for agencies and businesses looking to showcase their staff. I’ve often noticed that businesses have a hard time designing these types of layouts. So to get multiple layouts with interactivity built-in is worthy of a chef’s kiss ??.

  • Predesigned, interactive popups for team member bios and profiles
  • Fully customizable with Divi Builder for changing colors, animations, and more
  • Multiple pop-up box styles to display your team your way

Originally priced at $7.99 and now at $6.39, this layout pack is well worth your attention. It has 24 sales and fits the bill of a not-so-known Divi product you should have on your radar.

Get Team Member Popup Modal Layout Pack

9. Accessibility Bundle

Was $72, now $57.60, during the Divi Summer Sale

Accessibility Bundle

The Accessibility Bundle by Divi-Modules is your all-in-one toolkit for enhancing the accessibility of your Divi websites at an unbeatable price. Typically, accessibility products can be quite expensive, but this bundle ensures that making your site accessible is both achievable and affordable. Additionally, improving your site’s accessibility can positively impact your SEO, as search engines favor websites that are user-friendly and accessible to all.

The bundle includes three essential accessibility tools:

  • Accessibility Sidebar: Allows visitors to customize your Divi website appearance based on their individual accessibility needs. Features include text-to-speech, navigation tools, and customizable appearance options.
  • Accessibility Attributes: Adds essential ARIA attributes to Divi elements for improved accessibility for users relying on assistive technologies. It’s easy to use by adding a simple setting drop-down in the Advanced tab of a Divi Element in the Visual Builder.
  • Accessibility Tweaks: Makes automatic adjustments to enhance navigation and accessibility across your site, including keyboard navigation and customizable focus rings.

This bundle is a must-have for anyone serious about creating an accessible web experience. At $57.60 (down from $72), it’s a bargain price you can’t ignore.

Get Accessibility Bundle

10. Divi Layouts Extended

Was $79, now $63.20, during the Divi Summer Sale

Divi Layouts Extended 2400+

Maximize your design potential with Divi Layouts Extended by Divi Extended, a plugin packed with hundreds of pre-designed layouts. It’s one of the most popular items on this list, but with 912 sales and a 5-star rating, it’s still relatively underused and worthy of some well-earned attention.

  • Includes over 24,000 premade layouts for extremely fast site-building (includes headers/footers/pages/sections/Woo/and more)
  • Use all these layouts on unlimited website usage with one license
  • Layouts are easy to use with their own Layout hub, which means you don’t need to manually import thousands of layouts

Normally $79, it’s a fantastic value during the sale for only $63.20 by itself.

Get Divi Layouts Extended

I have even better news, though. Divi Layouts Extended is included in the Summer Sale Layout Booster Bundle. Get this collection for 50% off and enjoy yourself this fine set of layouts (plus way, way more).

Get the Whole Layout Booster Bundle

11. Divi GDPR & Google Fonts

Was $79, now $63.20, during the Divi Summer Sale

Divi GDPR & Google Fonts Extension

For those concerned about privacy compliance, the Divi GDPR & Google Fonts plugin by Bajorat Media ensures your site meets GDPR standards while offering Google Fonts integration. It handles many different GDPR tasks all at once.

  • Ensures GDPR compliance by blocking Google Fonts until consent is given
  • Automatic font replacement with local fonts to protect user privacy
  • Simplifies compliance with one-click configuration and easy integration

Despite a slightly lower rating of 3.5 stars, it’s a useful tool that helps you stay compliant at $63.20 (normally $79). Remember, you have a 30-day money-back guarantee on all marketplace purchases. You also have direct contact with the extension author so they can help you with the product and maybe even improve it with your valued feedback.

Get Divi GDPR & Google Fonts

12. Divi Engine Ajax Filter

Was $97, now $77.60, during the Divi Summer Sale

Divi Ajax Filter by Divi Engine

The Divi Engine Ajax Filter is ideal for building fast, light-loading filtering systems for WooCommerce and ACF custom post types. It lets users filter products and posts dynamically without page reloads, making finding what they’re looking for.

  • Supports multiple filters, including products, categories, tags, prices, and other attributes
  • Real-time filtering with AJAX for seamless browsing
  • With WooCOmmerce and ACF to create customized and complex filters

This plugin is a steal at $77.60 (normally $97). If you run a sprawling WooCommerce site, this might just be the Divi Extension to make your site more navigatable.

Get Divi Engine Ajax Filter

13. Identity Child Theme

Was $79, now $55.30, during the Divi Summer Sale

Identity Child Theme for Divi

The Identity Child Theme by Divi Lover is perfect for high-functioning one-page websites. Its stylish design and customization features have earned it eight sales and a 4.5-star rating, making it a true sleeper deal.

  • A minimalist design ideal for portfolios, simple businesses, and personal branding
  • Includes multiple prebuilt page layouts for plug-and-play usability
  • Easily change colors with global color system and light/dark color combinations

Now at $55.30 (normally $79), it’s a great investment for creating a standout site. I highly recommend that you grab this relatively unknown child theme today.

Get Identity Child Theme

14. Divi Instagram Feed

Was $29, now $23.20, during the Divi Summer Sale

Divi Instagram Feed Extension

You work hard to keep that feed trending up. Now, integrate your Instagram content seamlessly with your website using Divi Instagram Feed by Iqonic Design. This extension helps site owners flaunt their favorite social channel and hook their fans with constant drips of new content.

  • Truly effortless integration of Instagram feeds into Divi layouts
  • Fully customizable display settings, including grid, slider, and carousel options
  • Supports multiple accounts and hashtag feeds for broader content reach

With 1108 sales and a 4-star rating, this plugin is a solid choice for showcasing social media content directly on a site, marked down to $23.20 (typically $29).

Get Divi Instagram Feed

15. Graphina Divi Dynamic Charts & Graphs

Was $19, now $15.20, during the Divi Summer Sale

Graphina-Divi Dynamic Charts & Graphs Extension

For data visualization, Graphina Divi Dynamic Charts & Graphs by DiviEpic Plugins offers something you can’t pass up on. Forget manually creating charts with charts.js (or Excel, for that matter) and join a new era of data visualization.

  • Create dynamic and interactive charts and graphs within Divi
  • Supports various chart types, including radial, polar, area, bar, pie, and line charts
  • Fully customizable with advanced data visualization options and 70+ styling options
  • Easy, easy, easy data labels on all chart types

With 831 sales and a 4-star rating, this plugin easily creates interactive charts and graphs within Divi. It’s available for $15.20 during the sale (you’d normally fork over $19 for this beaut).

Get Graphina Divi Dynamic Charts & Graphs

16. Divi Query Builder

Was $19, now $9.50, during the Divi Summer Sale

Divi Query Builder Extension

Finally, the Divi Query Builder by Divi Coding is a powerful tool for creating custom post queries and layouts. If you work with custom post types, this extension should be at the top of your list. Easily create loops and display them in multiple styles.

  • Create custom queries for posts, pages, custom post types, and taxonomies
  • Supports advanced filtering and sorting options for dynamic content
  • It also supports custom post meta fields for a truly powerful display of, well, everything

With 48 sales and a 5-star rating, it’s a versatile extension/plugin priced to sell at $9.20 (50% off the normal price of $19).

Get Divi Query Builder

But you should know something. Divi Query Builder is included in the Summer Sale Feature Booster Bundle. Get this extension and all the others in this group for 50% off!

Get the Whole Feature Booster Bundle

Bundle and Save Big (50% Off)

If you’re after the steepest deals, you have to take notice of our Marketplace Bundles. There are hundreds of exceptional third-party Divi extensions, layouts, and child themes, all of which have undergone strict quality assurance testing. This ensures you receive the best from our community, with everything working seamlessly together—and with Divi.

We’ve curated a selection of our top third-party modules, layouts, and features into three large product bundles and marked them down by 50%.

Module Booster Bundle – Get 50% Off

Add 250+ new Divi modules to your toolkit for a fraction of the price you’d pay at any other time of the year. We’ve packaged 7 of the Divi Marketplace’s best-selling module collections into our Summer Sale Module Bundle. This bundle is a unique offer, available only during our Summer Sale. Once the sale ends, this bundle won’t be available again. Don’t miss your chance to enhance your WordPress arsenal, save hundreds of dollars, and boost your Divi website-building skills and speed by purchasing the Divi Summer Sale Module Bundle!

Get The Bundle

Layout Booster Bundle – Get 50% Off

The largest Divi layouts bundle is here… but only for a limited time. If you find yourself stuck for inspiration, this bundle will get you unstuck ASAP. We’ve packed together over 18,500 pre-made designs just for you. You can look forward to receiving page layouts, product layouts, blog templates, header templates, footer templates, and much more— all at 50% off! Grab this incredible bundle before the timer runs out. The Summer Sale is the ONLY time you’ll be able to get 16 of the Divi Marketplace’s best-selling, most popular layout packs. Save time on your next year’s worth of projects by seizing this deal!

Get The Bundle

Feature Booster Bundle – Get 50% Off

This is the ultimate bundle for those looking to push Divi’s extensive functionality further. Every product in this bundle extends Divi’s standard features and enhances your website-building capabilities. You’ll get products to create contact forms, mega menus, tabs, and more! Don’t miss out on this bundle. Head over to the sale now to take advantage of a 50% discount on 13 of the most popular products in the Divi Marketplace. This is a once-a-year opportunity only available during the Summer Sale.

Get The Bundle

Divi’s Summer Sale is Blazing Hot

The Divi Summer Sale is our hottest sales event of the season, offering incredible discounts on some of the most powerful tools in the Divi ecosystem. Whether you’re a long-time Divi user or just getting started, there’s no better time to expand your toolkit and elevate your web design game. These hidden gems and other popular picks are too good to pass up.

But remember, these deals won’t last forever—act now to take advantage of these low prices and enhance your Divi experience. Don’t miss out on the opportunity to save big and take your website(s) to the next level!

Find Exclusive Offers in the Summer Sale!

Divi Marketplace

Are You A Divi User? Find Out How To Get More From Divi! 👇

Browse hundreds of modules and thousands of layouts.

Visit Marketplace
Divi Marketplace
Divi Cloud

Find Out How To Improve Your Divi Workflow 👇

Learn about the new way to manage your Divi assets.

Get Divi Cloud
Divi Cloud
Divi Hosting

Want To Speed Up Your Divi Website? Find Out How 👇

Get fast WordPress hosting optimized for Divi.

Speed Up Divi
Divi Hosting
Premade Layouts

Check Out These Related Posts

Give Your Divi Designs A New Look With The Icon Manager

Give Your Divi Designs A New Look With The Icon Manager

Posted on November 12, 2026 in Divi Resources

A coffee cup can feel like a quick stop or an invitation to stay. Its shape and weight contribute to that impression, alongside the words and colors around it. The new Icon Manager in Divi 5 makes it easier to bring another icon family into a design. You can import SVGs into a collection and choose...

View Full Post
The Ultimate Guide To Typography In Divi 5

The Ultimate Guide To Typography In Divi 5

Posted on November 11, 2026 in Divi Resources

A heading can look right on its own and still feel out of place on the page. Add a different font weight to the next section, tighten the body copy somewhere else, and the small decisions start pulling against each other. Typography becomes easier to manage when those decisions share a...

View Full Post
Comparing And Optimizing The Cost of Divi AI Agents

Comparing And Optimizing The Cost of Divi AI Agents

Posted on November 9, 2026 in Business

AI is changing the way we build websites. Instead of manually editing every module or building layouts from scratch, you can describe what you want and let an AI agent handle the work. But not every task requires the same level of AI processing power, and choosing the wrong model can mean spending...

View Full Post

Leave A Reply

Comments are reviewed and must adhere to our comments policy.

Join To Download Today